Twin Loop Coated Steel ODM 2:1 Pitch Metal Binding Coils
Product Details:
Place of Origin: | China |
Brand Name: | Sudi |
Certification: | ROHS , SGS , CPST |
Model Number: | N2017 |
Payment & Shipping Terms:
Minimum Order Quantity: | 500pcs |
---|---|
Price: | Negotiable |
Packaging Details: | Export carton |
Delivery Time: | 15-30 days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Detail Information |
|||
Product Desc.: | Twin Loop Leaf Book Binding Coil | Color: | Silver |
---|---|---|---|
Material: | Nylon Coated Steel | Binding Thickness: | From 4.8mm To 41mm |
Product Size: | From 1/4" To 1-3/4" | Pitch: | 3:1 / 2:1 |
Custom Order: | OEM / ODM | MOQ: | 500pcs |
High Light: | 2:1 Pitch Metal Binding Coils,ODM Metal Binding Coils,2:1 Pitch Cinch Book Binding Wires |
Product Description
Steel Made Twin Loop Binding Wire , Spiral Binding Coils In Custom Colors
Quick Details :
a. Using first grade steel with environmental nylon coated binding coil in silver color ;
b. With the wide range of size from 1/4" to 1-3/4" , pitch 2:1 and 3:1 ;
c. Custom order of OEM or ODM ;
d. Packing with white paper box or spool .
Specifications :
Product Size (mm) | Pitch | Binding Thickness (mm) | Recommended Max Number of sheet (80g) |
1/4” (6.4mm) | 3:1 | 4.8 | 45 |
5/16” (7.9mm) | 6.4 | 60 | |
3/8” (9.5mm) | 7.9 | 75 | |
7/16” (11.1mm) | 9.5 | 85 | |
1/2” (12.7mm) | 11.1 | 100 | |
9/16” (14.3mm) | 12.7 | 120 | |
5/8” (15.9mm) | 14.3 | 135 | |
5/8” (15.9mm) | 2:1 | 14.3 | 135 |
3/4” (19.1mm) | 17.5 | 165 | |
7/8” (22.2mm) | 20.6 | 180 | |
1” (25.4mm) | 23.8 | 200 | |
1-1/8” (28.6mm) | 26.5 | 220 | |
1-1/4” (31.8mm) | 30 | 240 | |
1-3/8” (34.9mm) | 33.5 | 260 | |
1-1/2” (38.1mm) | 36 | 280 | |
1-5/8”(41.27mm) | 2:1 | 38 | 320 |
1-3/4”(44.45mm) | 2:1 | 41 | 340 |
Advantage :
1. Manufacturer supply with fast delivery ;
2. Wide range of color choices , including gold , silver , bronze and variety of metallic colors ;
3. Quality guarantee for 1 year ;
4. Widely used in various kinds of booking binding and calendar binding ;
FQA :
QUESTION: What about the lead time for mass production?
Honestly, it depends on the order quantity and the season you place the order. Generally speaking, production lead time is within 2~4 weeks.
QUESTION: What is your terms of delivery?
We accept EXW, FOB, CIF, etc. You can choose the one which is the most convenient or cost effective for you.
QUESTION: Terms of payment?
We accept payment as the following, T/T ,Western Union or L/C at sight.